Aerial Fiber Optic Cable Installation

Generally speaking they are usually made of heavy jackets and strong metal or aramid strength members.
Aerial fiber optic cable installation. Completely metal free design with fiber counts from 12 to 288 fibers suitable for deployment near high voltage power lines in long spans. 3 02 before cable. Lashing fiber optic cable to a messenger cable the installation process of a lashed aerial fiber optic cable will generally require one or more bucket trucks to allow workers to reach the location of the lashing guide cables around poles and through trees or other obstacles and move the lasher across poles. A new fiber optic installation standard.
Like every other fiber cable aerial cable can be field spliced or deployed pre terminated. Hands on video training presentation for osp fttx project deployment and activ. When installing optical cable what you don t know could really hurt you or damage your cable. The main drawback to using pre terminated.
This video presents the fiber optic cable laying on underground application. Labor according to engineering studies the bulk of the price of fiber optic installation is in the labor fees in fact it is estimated that 50 to 80 of the cost are all attributed to the labor cost. These cables are commonly called as aerial fiber cables which are widely used for outside plant osp installation on poles. There are also different types of aerial fiber optic cables.
Also company safety precautions for aerial fiber optic cable operations should be reviewed before work begins and practiced during the entire installation process. Familiarizing yourselfwith standard 301 is a smart step to avoid such problems up until a little over a year ago an installation standard for optical cable didn t exist. Typical fiber optic cable installation includes the following. Before starting any aerial fiber optic cable installation all personnel must be thoroughly familiar with occupational safety and hazard act osha regulations.
For the last drop especially many network operators choose to use pre terminated aerial cable because it eliminates the need for time consuming and expensive fusion splicing. Also available in mid and long length spans. Each method has its pros and cons.